Skip to main content

ESB constructed this new classroom addition on TUSD’s existing campus on a fixed price contract with contingency.

From the start, ESB worked with Earl Kai Chann Associates, Ltd. as they provided the design and drawings for the new buildings at Borton Elementary

We served as general contractor for the project and completed it using our hybrid on- and offsite construction methodology.

The building is complete with classrooms, offices, storage and additional restroom facilities. The aesthetics of the building are embellished with a distinctive, customized Kal-Wal translucent roofing system, allowing natural light to enter the hallway between buildings.

This building’s finishes include metal overhangs and brick wainscot to match their existing campus.

Client

Tucson Unified School District

Size

11,178 SF

We use cookies for a number of reasons, such as keeping our website reliable and secure, personalizing content, providing social media features and to analyze how our website is used.

Choose which cookies to allow.
You can change these settings at any time.

Cookies required for the website to run properly:

  • Essential: Remember cookie permission settings
  • Essential: Allows cookie sessions
  • Essential: Log in to your user account

By accepting these cookies you allow the site to:

  • Analysis: Keeps track of location and region based on IP
  • Analysis: Keep track of time spent on each page
  • Analysis: Increases the quality of data in the statistical function